Quick answers
What is "Morrum Mining Project"?
"Morrum Mining Project" is an approved mining project in Basariya, Sarila, Hamirpur, Uttar Pradesh. The site covers 34.6 acres.
Who is building it?
The applicant is Exsand Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Oct 2023), as of 27 Nov 2026.
Where is it?
In Basariya, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹7 crore and a site of 34.6 acres.
When was it filed?
The application was filed on 26 Oct 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Oct 2023 |
| Application filed | 26 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Exsand Private Limited |
| Land area | 34.6 acres (14 ha) |
| Project cost | ₹7 crore |
| Village / locality | Basariya |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00952 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Oct 2023 (this page) | Environmental approval granted | 34.6 acres | ₹7 crore |
| Early planning filed 25 May 2023 | Cleared for impact study | 34.6 acres | ₹7 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 34.6 acres, this one is smaller than 72% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Basariya, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Morrum Mining Project" — cleared for impact study, 0 m away
- Morrum Mine — environmental approval granted, 3.5 km away
- The Proposed Project of Bhedi Dariya Morrum Deposit on the riverbed of Betwa… — under environmental review, 6.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — lapsed, 6.2 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Betwa River at… — cleared for impact study, 6.2 km away
- Sand/Morrum — environmental approval granted, 6.5 km away
- Sand/Morrum — cleared for impact study, 6.5 km away
- Sand/Morrum Mining along Betwa Riverbed in Gata no- 35/1, 65/35, 39, 40/1,… — under environmental review, 6.9 km away
More from Exsand Private Limited in Hamirpur
- Morrum Mine — environmental approval granted
- Morrum Mine — cleared for impact study
All 4 Exsand projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.