Quick answers
What is this project?
Sand/Morrum Mining along Betwa Riverbed in Gata no- 35/1, 65/35, 39, 40/1, 42/2, 40/5, 56/2, 37/1, 38/1, 509/1, 509/2, 862/1, Khand No- 22/10, Total Area 24.291ha is a proposed mining project in Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh. The site covers 60 acres.
Who is building it?
The applicant is Pramod Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹64 lakh and a site of 60 acres.
When was it filed?
The application was filed on 29 Nov 2025.
Project details
| Official title | Sand/Morrum Mining along Betwa Riverbed in Gata no- 35/1, 65/35, 39, 40/1, 42/2, 40/5, 56/2, 37/1, 38/1, 509/1, 509/2, 862/1, Khand No- 22/10, Total Area 24.291ha, at Village - Chandaut Dariya, Chandaut Danda, Tehsil-Sarila, Distt-Hamirpur, U. P. |
|---|---|
| Status | Under environmental review |
| Status since | 20 Nov 2026 |
| Application filed | 29 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Pramod Singh |
| Land area | 60 acres (24.3 ha) |
| Project cost | ₹64 lakh |
| Village / locality | Chandaut Daria |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03652 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 60 acres, this one is larger than 59% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 120.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chandaut Dariya, Chandaut Danda Sand/Morrum Mining Project (12.145Ha) — initial checks, 400 m away
- Chandaut Dariya, Chandaut Danda Sand/Morrum Mining Project (12.145Ha) — under environmental review, 400 m away
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya,… — environmental approval granted, 400 m away
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya,… — cleared for impact study, 400 m away
- Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — under environmental review, 900 m away
- Sand/Morrum Mining at Betwa River Bed, Gata No.- 35/1, Khand No.-22/14, Area –… — environmental approval granted, 1.4 km away
- Sand/Morrum Mining at Betwa River Bed, Gata No.- 35/1, Khand No.-22/14, Area –… — cleared for impact study, 1.4 km away
- Sand/Morrum Mining along Betwa Riverbed in Khand No. 22/15, Gata no 35/1,… — lapsed, 1.6 km away
More from Pramod Singh in Hamirpur
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — initial checks
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — lapsed
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — cleared for impact study
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.