What is Morrum Mine?
Morrum Mine is an approved mining project in Basariya, Sarila, Hamirpur, Uttar Pradesh. The site covers 29.7 acres.
Who is building it?
The applicant is Exsand Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Mar 2023), as of 27 Nov 2026.
Where is it?
In Basariya, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 lakh and a site of 29.7 acres.
When was it filed?
The application was filed on 31 Mar 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 31 Mar 2023 |
| Application filed | 31 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Exsand Private Limited |
| Land area | 29.7 acres (12 ha) |
| Project cost | ₹1 lakh |
| Village / locality | Basariya |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00728 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Mar 2023 (this page) | Environmental approval granted | 29.7 acres | ₹1 lakh |
| Early planning filed 15 Oct 2022 | Cleared for impact study | 29.7 acres | ₹1 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 29.7 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Basariya, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Morrum Mining Project" — environmental approval granted, 3.5 km away
- "Morrum Mining Project" — cleared for impact study, 3.5 km away
- Sand/Morrum Mining along Betwa Riverbed in Gata no- 35/1, 65/35, 39, 40/1,… — under environmental review, 3.7 km away
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya,… — environmental approval granted, 4.1 km away
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya,… — cleared for impact study, 4.1 km away
- Chandaut Dariya, Chandaut Danda Sand/Morrum Mining Project (12.145Ha) — initial checks, 4.1 km away
- Chandaut Dariya, Chandaut Danda Sand/Morrum Mining Project (12.145Ha) — under environmental review, 4.1 km away
- Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — under environmental review, 4.5 km away
More from Exsand Private Limited in Hamirpur
- "Morrum Mining Project" — environmental approval granted
- "Morrum Mining Project" — cleared for impact study
All 4 Exsand projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.