What is Developing? Open the mapMap

Environmental approval grantedMining · Sambhal, Uttar Pradesh

Proposed "Ordinary Soil Excavation" Project Area- 2.248 Ha. at Gata No.– 1581, 1583, 1578 & 1507, Village- Akrauli, Tehsil- Chandausi & District- Sambhal, U.P.

Proposed "Ordinary Soil Excavation" Project Area- 2.248 Ha. at Gata No.– 1581, 1583, 1578 & 1507, Village- Akrauli, Tehsil- Chandausi & District- Sambhal, U.P is an approved mining project in Akrauli, Chandausi, Sambhal, Uttar Pradesh. The site covers 1.1 acres. Its stated project cost is ₹12 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 14 Apr 2023).

See it on the live map All projects in Sambhal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Ordinary Soil Excavation" Project Area- 2.248 Ha. at Gata No.– 1581, 1583, 1578 & 1507, Village- Akrauli, Tehsil- Chandausi & District- Sambhal, U.P is an approved mining project in Akrauli, Chandausi, Sambhal, Uttar Pradesh. The site covers 1.1 acres.

Who is building it?

The applicant is Phool Prakash.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 14 Apr 2023), as of 27 Nov 2026.

Where is it?

In Akrauli, Chandausi, Sambhal, Uttar Pradesh.

How big is it?

It has a stated cost of ₹12 lakh and a site of 1.1 acres.

When was it filed?

The application was filed on 14 Apr 2023.

Project details

StatusEnvironmental approval granted
Status since14 Apr 2023
Application filed14 Apr 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantPhool Prakash
Land area1.1 acres (0.5 ha)
Project cost₹12 lakh
Village / localityAkrauli
Taluk / tehsilChandausi
DistrictSambhal
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00976

In context

51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.1 acres, this one is smaller than 98% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Akrauli, Chandausi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.