Quick answers
What is this project?
"Ordinary Earth Mining" Project at Gata No.- 367, 383, 650, Village- Rajthal, Tehsil- Chandausi, District-Sambhal, U.P. (Area – 2.8197 ha). Shri Rahul Giri is an approved mining project in Rajthal, Chandausi, Sambhal, Uttar Pradesh. The site covers 7 acres.
Who is building it?
The applicant is Rahul Giri.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Oct 2024), as of 27 Nov 2026.
Where is it?
In Rajthal, Chandausi, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹21 lakh and a site of 7 acres.
When was it filed?
The application was filed on 24 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Oct 2024 |
| Application filed | 24 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rahul Giri |
| Land area | 7 acres (2.8 ha) |
| Project cost | ₹21 lakh |
| Village / locality | Rajthal |
| Taluk / tehsil | Chandausi |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01984 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7 acres, this one is larger than 55% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Rajthal, Chandausi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Ordinary Earth excavation from Khasra/Gata Proposed Ordinary Earth… — environmental approval granted, 1.6 km away
- "Ordinary Soil Mining" Project at Gata No.- 207, 247ग, 248, 271, 275 Village-… — environmental approval granted, 2.5 km away
- "Ordinary Soil Mining" Project at Gata No.- 404, 433, 396, 392, 399, Village-… — environmental approval granted, 2.8 km away
- Proposed Retail Outlet by Hindustan Petroleum Corp. Ltd. at Km. Ch. 34.483 on… — under forest review, 5.1 km away
- Proposed "Ordinary Soil Excavation" Project Area- 2.248 Ha. at Gata No.– 1581,… — environmental approval granted, 5.2 km away
- Proposed protected forest land to be diverted for Block spot by Construction… — lapsed, 7.4 km away
- Proposed protected forest land to be diverted for Block spot by Construction… — forest land use approved, 7.4 km away
- The Project Envisages the Use of Protected Forest Land for the Construction of… — forest land use approved, 7.9 km away
More from Rahul Giri in Sambhal
- Proposed Ordinary Earth excavation from Khasra/Gata Proposed Ordinary Earth… — environmental approval granted
- Environmental Clearance of Proposed Ordinary Earth excavation from Khasra/Gata… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.