Quick answers
What is this project?
Proposed SSP (Single Super Phosphate) Manufacturing Project located at Khimsepur Industrial Area, Farrukhabad, Uttar Pradesh by M/s Madan Madhav Fertilizer & Chemical Pvt. Ltd is a proposed industrial project in Khimsepur, Farrukhabad, Uttar Pradesh. The site covers 3.1 acres.
Who is building it?
The applicant is Madan Madhav Fertilizer & Chemical Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 May 2023), as of 27 Nov 2026.
Where is it?
In Khimsepur, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹17 crore and a site of 3.1 acres.
When was it filed?
The application was filed on 3 May 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 May 2023 |
| Application filed | 3 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Madan Madhav Fertilizer & Chemical Private Limited |
| Land area | 3.1 acres (1.2 ha) |
| Project cost | ₹17 crore |
| Village / locality | Khimsepur |
| Taluk / tehsil | Farrukhabad |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00982 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khimsepur, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 180 KLPD Molasses/Grain based Distillery by M/s. Woodpecker Greenagri… — cleared for impact study, 1 km away
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — more information requested, 5.8 km away
- Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in… — cleared for impact study, 6.7 km away
- Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in… — under environmental review, 6.7 km away
- Proposed "Ordinary Soil Mining Project" at Gata 257 & 258 by Smt. Dhan Devi — under environmental review, 8.1 km away
- Proposed protected Forest Land to be diverted for Exit/Entry of New Bharat… — forest land use approved, 13.1 km away
- Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of… — forest land use approved, 19.4 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 21.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.