Quick answers
What is this project?
Proposed protected Forest Land to be diverted for Exit/Entry of New Bharat petroleum Corporation Ltd Retail Outlet on Bewar-Etawah Road (NH-730C) Between Km.-23 (Ch.22.745 LHS) is an approved fuel station in Nisai, Farrukhabad, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Sanjay Anand.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 25 Apr 2026), as of 27 Nov 2026.
Where is it?
In Nisai, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.8 acres and 1,780 m² of forest land.
When was it filed?
The application was filed on 17 Feb 2025.
Project details
| Official title | Proposed protected Forest Land to be diverted for Exit/Entry of New Bharat petroleum Corporation Ltd Retail Outlet on Bewar-Etawah Road (NH-730C) Between Km.-23 (Ch.22.745 LHS), At Khasra No.-717 & 718 Village-Nisai (Mohammadabad) Tahsil Farrukhabad District-Farrukhabad (U.P.). |
|---|---|
| Status | Forest land use approved |
| Status since | 25 Apr 2026 |
| Application filed | 17 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Sanjay Anand |
| Land area | 3,400 m² |
| Forest land | 1,780 m² |
| Project cost | ₹60 lakh |
| Village / locality | Nisai |
| Taluk / tehsil | Farrukhabad |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05379 |
In context
9 applications in Farrukhabad since January 2022 are in the same category (Fuel stations): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval.
Where it is
Nisai, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of… — forest land use approved, 6.4 km away
- Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in… — cleared for impact study, 6.4 km away
- Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in… — under environmental review, 6.4 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 9 km away
- Proposed "Ordinary Soil Mining Project" at Gata 257 & 258 by Smt. Dhan Devi — under environmental review, 11.8 km away
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — more information requested, 12 km away
- Proposed 180 KLPD Molasses/Grain based Distillery by M/s. Woodpecker Greenagri… — cleared for impact study, 12.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 13 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.