Quick answers
What is this project?
Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in the State of Uttar Pradesh by UPEIDA is a proposed road project in Adioli, Farrukhabad, Uttar Pradesh. The site covers 14,345.2 acres.
Who is building it?
The applicant is Uttar Pradesh Expressways Industrial Development Authority (Upeida).
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Adioli, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹7,488 crore and a site of 14,345.2 acres.
When was it filed?
The application was filed on 15 Dec 2025.
Project details
| Official title | Development of Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in the State of Uttar Pradesh by UPEIDA. |
|---|---|
| Status | Under environmental review |
| Status since | 27 Aug 2026 |
| Application filed | 15 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 14,345.2 acres (5,805.3 ha) |
| Project cost | ₹7,488 crore |
| Village / locality | Adioli |
| Taluk / tehsil | Farrukhabad |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03484 |
In context
6 applications in Farrukhabad since January 2022 are in the same category (Roads & highways): 2 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Adioli, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in… — cleared for impact study, 0 m away
- Proposed protected Forest Land to be diverted for Exit/Entry of New Bharat… — forest land use approved, 6.4 km away
- Proposed 180 KLPD Molasses/Grain based Distillery by M/s. Woodpecker Greenagri… — cleared for impact study, 6.4 km away
- Proposed SSP (Single Super Phosphate) Manufacturing Project located at… — cleared for impact study, 6.7 km away
- Proposed "Ordinary Soil Mining Project" at Gata 257 & 258 by Smt. Dhan Devi — under environmental review, 8 km away
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — more information requested, 12.4 km away
- Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of… — forest land use approved, 12.8 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 15.3 km away
More from Uttar Pradesh Expressways Industrial Development Authority (Upeida) in Farrukhabad
- Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in… — cleared for impact study
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.