Quick answers
What is this project?
"Gitti / Patthar" Project at Gata No.- New 360 (Old 918), Village- Mataundh, Tehsil- Banda, District- Banda, U.P. (Applied Area : 1.821 ha.), M/s Shailendra Singh Partner- Smt. Shivani Singh W/o Shri Narendra Singh is an approved mining project in Mataundh, Banda, Uttar Pradesh. The site covers 4.5 acres.
Who is building it?
The applicant is Shivani Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Aug 2023), as of 27 Nov 2026.
Where is it?
In Mataundh, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh and a site of 4.5 acres.
When was it filed?
The application was filed on 14 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Aug 2023 |
| Application filed | 14 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shivani Singh |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Mataundh |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01012 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.5 acres, this one is smaller than 92% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mataundh, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed to be diverted for the Widening of the Existing… — under forest review, 6.2 km away
- Proposed forest land to be diverted for Laying of Drinking Water Pipeline… — forest land use approved, 6.3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — forest land use approved, 7.8 km away
- Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 9.1 km away
- Proposed River Bed Sand/Morrum Mining having lease area 10.0 ha (24.71 acre)… — environmental approval granted, 14.3 km away
- Proposed River Bed Sand/Morrum Mining having lease area 10.0 ha (24.71 acre)… — cleared for impact study, 14.3 km away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Ganchha, Gata No.-… — initial checks, 14.3 km away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Ganchha, Gata No.-… — under environmental review, 14.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.