Quick answers
What is Project for Laying of Carbon Steel Gas Pipe Line (300mm)?
Project for Laying of Carbon Steel Gas Pipe Line (300mm) is an approved pipeline project in Goyra Mughli, Banda, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Indraprastha Gas Limited New Delhi.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 13 May 2025), as of 27 Nov 2026.
Where is it?
In Goyra Mughli, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹86 lakh; a site of 1.6 acres and 1.6 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 14 Jun 2024.
Project details
| Official title | Project for Laying of Carbon Steel Gas Pipe Line (300mm) along with road on Mahoba-Banda Marg (NH-35) from Km. 16.9 to Km. 29.5 (On L.H.S.), Total Km. 12.6 & 0.63 Ha. In Forest Division/ Social Forestry Division Banda, District-Banda (UP) |
|---|---|
| Status | Forest land use approved |
| Status since | 13 May 2025 |
| Application filed | 14 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indraprastha Gas Limited New Delhi |
| Land area | 1.6 acres (0.6 ha) |
| Forest land | 1.6 acres (0.6 ha) |
| Project cost | ₹86 lakh |
| Village / locality | Goyra Mughli |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05632 |
In context
5 applications in Banda since January 2022 are in the same category (Pipelines): 3 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Goyra Mughli, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1.3 km away
- Protected Forest Land proposed to be diverted for the Widening of the Existing… — under forest review, 1.6 km away
- Proposed forest land to be diverted for Laying of Drinking Water Pipeline… — forest land use approved, 1.9 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — environmental approval granted, 7.5 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 7.5 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — lapsed, 7.5 km away
- Proposed riverbed sand/morrum mining project from Ken River of Uncle And Sons… — lapsed, 7.5 km away
- Proposed riverbed sand/morrum mining project from Ken River of Uncle And Sons… — cleared for impact study, 7.5 km away
More from Indraprastha Gas Limited New Delhi in Banda
- Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
3 Indraprastha Gas Limited projects in Banda
All 35 Indraprastha Gas Limited projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.