Quick answers
What is Ordinary Sand Mining Project on River Bed of Ganges River?
Ordinary Sand Mining Project on River Bed of Ganges River is an approved mining project in Nauabarar Belchhipahi 1881, Ballia, Uttar Pradesh. The site covers 12.4 acres.
Who is building it?
The applicant is Jai Rai.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 May 2023), as of 27 Nov 2026.
Where is it?
In Nauabarar Belchhipahi 1881, Ballia, Uttar Pradesh.
How big is it?
It has a stated cost of ₹70 lakh and a site of 12.4 acres.
When was it filed?
The application was filed on 6 May 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 May 2023 |
| Application filed | 6 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jai Rai |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Nauabarar Belchhipahi 1881 |
| Taluk / tehsil | Ballia |
| District | Ballia |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01106 |
In context
9 applications in Ballia since January 2022 are in the same category (Mining): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Nauabarar Belchhipahi 1881, Ballia, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Four laning of Ghazipur–Balia new Greenfield Section: Starts by NHAI — under environmental review, 11.8 km away
- Exploratory drilling of Two wells in OALP-VI BLOCK, GV-ONHP-2021/2 — environmental approval granted, 15.2 km away
- 3d Seismic Survey for Hydrocarbon Exploration. — under wildlife review, 16.9 km away
- Proposed Building/Road in the Premises of Jannayak Chandrashekhar University,… — more information requested, 26 km away
- Proposed Building/Road in the Premises of Jannayak Chandrashekhar University — more information requested, 26 km away
- Proposed distillery unit of capacity 100 KLD (Grain Based) by M/s Namami Ganga… — under environmental review, 32.1 km away
- Proposed distillery unit of capacity 100 KLD (Grain Based) by M/s Namami Ganga… — environmental approval granted, 32.1 km away
- Proposed distillery unit of capacity 100 KLD (Grain Based) by M/s Namami Ganga… — cleared for impact study, 32.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.