What is Developing? Open the mapMap

Cleared for impact studyMining · Mahoba, Uttar Pradesh

Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 512 (Khand No.- 05), Village- Gauhari, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.053 ha.) , Prop.- Shri Siddh Gopal Sahu S/o Shri Chhanga Prasad Sahu

Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 512 (Khand No.- 05), Village- Gauhari, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.053 ha.) , Prop.- Shri Siddh Gopal Sahu S/o Shri Chhanga Prasad Sahu is a proposed mining project in Baghwakhor, Mahoba, Uttar Pradesh. The site covers 2.6 acres. Its stated project cost is ₹79 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 21 Apr 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 512 (Khand No.- 05), Village- Gauhari, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.053 ha.) , Prop.- Shri Siddh Gopal Sahu S/o Shri Chhanga Prasad Sahu is a proposed mining project in Baghwakhor, Mahoba, Uttar Pradesh. The site covers 2.6 acres.

Who is building it?

The applicant is SH. Siddh Gopal Sahu.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 21 Apr 2023), as of 27 Nov 2026.

Where is it?

In Baghwakhor, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹79 lakh and a site of 2.6 acres.

When was it filed?

The application was filed on 21 Apr 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata…

Project details

StatusCleared for impact study
Status since21 Apr 2023
Application filed21 Apr 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSH. Siddh Gopal Sahu
Land area2.6 acres (1.1 ha)
Project cost₹79 lakh
Village / localityBaghwakhor
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01120

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Sept 2023Environmental approval granted2.6 acres₹79 lakh
Early planning filed 21 Apr 2023 (this page)Cleared for impact study2.6 acres₹79 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.6 acres, this one is smaller than 61% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 12.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.

Where it is

Baghwakhor, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.