Quick answers
What is this project?
Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at Araji No. 968, 796 & 1102, Area: 8.903 Ha, Village: Pachauro, Tehsil: Mauranipur, District: Jhansi, State: Uttar Pradesh is a proposed mining project in Pachauro, Mauranipur, Jhansi, Uttar Pradesh. The site covers 22 acres.
Who is building it?
The applicant is Archna Devi.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 1 Sept 2023), as of 27 Nov 2026.
Where is it?
In Pachauro, Mauranipur, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 22 acres.
When was it filed?
The application was filed on 1 Sept 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at Araji No.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 1 Sept 2023 |
| Application filed | 1 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Archna Devi |
| Land area | 22 acres (8.9 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Pachauro |
| Taluk / tehsil | Mauranipur |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01131 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Dec 2024 | Environmental approval granted | 22 acres | ₹1.4 crore |
| Early planning filed 1 Sept 2023 (this page) | Cleared for impact study | 22 acres | ₹1.4 crore |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 22 acres, this one is larger than 73% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Pachauro, Mauranipur, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at… — environmental approval granted, 0 m away
- Sand/Morrum Mining From Sukhnai Riverbed — cleared for impact study, 0 m away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 3.2 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 5.1 km away
- Building Stone or Khanda, Gitti, Boulder Mining Project — lapsed, 6.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 7.3 km away
- Proposed Indian Oil Corporation Limited Retail Outlet on Gursarai-Mauranipur… — forest land use approved, 7.7 km away
More from Archna Devi in Jhansi
- Sand/Morrum Mining from Sukhnai Riverbed — environmental approval granted
- Transfer of the EC for the Short Term Lease of Sand/Morum Mining Project at… — initial checks
- Transfer of the EC for the Short Term Lease of Sand/Morum Mining Project at… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.