What is Developing? Open the mapMap

Environmental approval grantedMining · Banda, Uttar Pradesh

Proposed Project of Sand/Morrum mining from Riverbed of Baghain River located at Gata No. 2/2 and 3, Area 3.11 ha

Proposed Project of Sand/Morrum mining from Riverbed of Baghain River located at Gata No. 2/2 and 3, Area 3.11 ha is an approved mining project in Badausa, Atarra, Banda, Uttar Pradesh. The site covers 7.7 acres. Its stated project cost is ₹2.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 6 Nov 2023).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of Sand/Morrum mining from Riverbed of Baghain River located at Gata No. 2/2 and 3, Area 3.11 ha is an approved mining project in Badausa, Atarra, Banda, Uttar Pradesh. The site covers 7.7 acres.

Who is building it?

The applicant is Aatif Iqbal.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 6 Nov 2023), as of 27 Nov 2026.

Where is it?

In Badausa, Atarra, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹2.2 crore and a site of 7.7 acres.

When was it filed?

The application was filed on 6 Nov 2023.

Project details

Official titleProposed Project of Sand/Morrum mining from Riverbed of Baghain River located at Gata No. 2/2 and 3, Area 3.11 ha in Village- Tarsuma, Tehsil- Attara, District- Banda, Uttar Pradesh
StatusEnvironmental approval granted
Status since6 Nov 2023
Application filed6 Nov 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAatif Iqbal
Land area7.7 acres (3.1 ha)
Project cost₹2.2 crore
Village / localityBadausa
Taluk / tehsilAtarra
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01158

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.7 acres, this one is smaller than 85% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Badausa, Atarra, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.