Quick answers
What is this project?
"Sand / Morrum Mining" from Riverbed of Baghain River Village- Tarsuma, Gata No.- 2/2 & 3, lease area- 3.11 ha., Tehsil- Atarra, District- Banda, Uttar Pradesh, Project Proponent- M/s Mayank Enterprises (Prop. - Shri Aviral Mishra) is an approved mining project in Tarsuman, Atarra, Banda, Uttar Pradesh. The site covers 7.7 acres.
Who is building it?
The applicant is Aviral Mishra.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Nov 2026), as of 27 Nov 2026.
Where is it?
In Tarsuman, Atarra, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 7.7 acres.
When was it filed?
The application was filed on 23 Jul 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 23 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Aviral Mishra |
| Land area | 7.7 acres (3.1 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Tarsuman |
| Taluk / tehsil | Atarra |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04207 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Jul 2026 (this page) | Environmental approval granted | 7.7 acres | ₹1.2 crore |
| Early planning filed 29 Dec 2025 | Under environmental review | 7.7 acres | ₹1.2 crore |
| Ownership transfer filed 22 Sept 2025 | Lapsed | 7.7 acres | ₹75 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.7 acres, this one is smaller than 85% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Tarsuman, Atarra, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand / Morrum Mining" from Riverbed of Baghain River Village- Tarsuma, Gata… — under environmental review, 0 m away
- "Sand / Morrum Mining" from Riverbed of Baghain River Village- Tarsuma, Gata… — lapsed, 0 m away
- Proposed Project of Sand/Morrum mining from Riverbed of Baghain River located… — environmental approval granted, 0 m away
- Sand Morrum Bajri Mine, Village- Mahuta (Gata/Araji No.- 876kha, 886ka, 1481,… — environmental approval granted, 2.3 km away
- Sand / morrum Mining, Village – Mahuta , Tehsil- Atarra , District Banda Gata… — under environmental review, 2.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 3.1 km away
- Protected Forest Land proposed to be diverted for the construction of Major… — initial checks, 3.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.