What is Developing? Open the mapMap

Under environmental reviewMining · Banda, Uttar Pradesh

"Sand / Morrum Mining" from Riverbed of Baghain River Village- Tarsuma, Gata No.- 2/2 & 3, lease area- 3.11 ha., Tehsil- Atarra, District- Banda, Uttar Pradesh, Project Proponent- M/s Mayank Enterprises (Prop. - Shri Aviral Mishra)

"Sand / Morrum Mining" from Riverbed of Baghain River Village- Tarsuma, Gata No.- 2/2 & 3, lease area- 3.11 ha., Tehsil- Atarra, District- Banda, Uttar Pradesh, Project Proponent- M/s Mayank Enterprises (Prop. - Shri Aviral Mishra) is a proposed mining project in Tarsuman, Atarra, Banda, Uttar Pradesh. The site covers 7.7 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 21 Jul 2026).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand / Morrum Mining" from Riverbed of Baghain River Village- Tarsuma, Gata No.- 2/2 & 3, lease area- 3.11 ha., Tehsil- Atarra, District- Banda, Uttar Pradesh, Project Proponent- M/s Mayank Enterprises (Prop. - Shri Aviral Mishra) is a proposed mining project in Tarsuman, Atarra, Banda, Uttar Pradesh. The site covers 7.7 acres.

Who is building it?

The applicant is Aviral Mishra.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Tarsuman, Atarra, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.2 crore and a site of 7.7 acres.

When was it filed?

The application was filed on 29 Dec 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: "Sand / Morrum Mining" from Riverbed of Baghain River Village- Tarsuma, Gata No.- 2/2 &…

Project details

StatusUnder environmental review
Status since21 Jul 2026
Application filed29 Dec 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAviral Mishra
Land area7.7 acres (3.1 ha)
Project cost₹1.2 crore
Village / localityTarsuman
Taluk / tehsilAtarra
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03501

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 Jul 2026Environmental approval granted7.7 acres₹1.2 crore
Early planning filed 29 Dec 2025 (this page)Under environmental review7.7 acres₹1.2 crore
Ownership transfer filed 22 Sept 2025Lapsed7.7 acres₹75 lakh

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.7 acres, this one is smaller than 85% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Tarsuman, Atarra, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.