Quick answers
What is this project?
"Building Stone or Granite Khanda, Boulder, Ballast (Gitty)" at Gata/Arazi No- 339 (Khand no.-38), Village– Daharra, Tehsil- Sadar, District– Mahoba, Uttar Pradesh Project Proponent- M/s V.R. Infrabuild India Pvt. Ltd. (Shri Jitendra Singh Bhadoriya) is a proposed mining project in Daharra, Mahoba, Uttar Pradesh. The site covers 4 acres.
Who is building it?
The applicant is V R Infrabuild India Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Aug 2023), as of 27 Nov 2026.
Where is it?
In Daharra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹88 lakh and a site of 4 acres.
When was it filed?
The application was filed on 29 Aug 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Aug 2023 |
| Application filed | 29 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | V R Infrabuild India Private Limited |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹88 lakh |
| Village / locality | Daharra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01199 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Jul 2026 | Under environmental review | 4 acres | ₹88 lakh |
| Early planning filed 29 Aug 2023 (this page) | Cleared for impact study | 4 acres | ₹88 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4 acres, this one is larger than 64% of them.
18 other mining leases have applied within 500 m of this site; together with this one they cover 61.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 37 mining leases have applied within 5 km.
Where it is
Daharra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone or Granite Khanda, Boulder, Ballast (Gitty)" at Gata/Arazi No-… — under environmental review, 0 m away
- Building Stone [Khanda, Gitti, Boulder] mine — under environmental review, 100 m away
- Building Stone [Khanda, Gitti, Boulder] mine — under environmental review, 100 m away
- "Building Stone (Khanda, Gitti, Boulder)" Project at Gata No.- 339 Khand No.-… — environmental approval granted, 100 m away
- "Building Stone (Khanda, Gitti, Boulder)" Project at Gata No.- 339 Khand No.-… — cleared for impact study, 100 m away
- Building stone, Khanda, Boulder, Balast (Gitti) (Granite) project — environmental approval granted, 150 m away
- Building stone, Khanda, Boulder, Balast (Gitti) (Granite) project — cleared for impact study, 150 m away
- Building Stone (Khanda,Gitti , Boulder) Mine — environmental approval granted, 200 m away
More from V R Infrabuild India Private Limited in Mahoba
- Building stone (Granite-Khanda-Boulder-Ballast(Gitty))" Mine at Gata/Arazi… — environmental approval granted
- Building stone (Granite-Khanda-Boulder-Ballast(Gitty))" Mine at Gata/Arazi… — cleared for impact study
All 4 V R Infrabuild projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.