One of 3 filings for this project. The project's main page, with every filing and where each stands: Waste management project by Ferrosang Enviro Solutions Private Limited
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Feb 2023 |
| Application filed | 13 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Ferrosang Enviro Solutions Private Limited |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹4.5 crore |
| Village / locality | Rasulpur |
| Taluk / tehsil | Unchahar |
| District | Rae Bareli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01226 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 10 Mar 2025 | Lapsed | 1.1 acres | ₹4.5 crore |
| New project filed 18 Jun 2023 | Environmental approval granted | 1.1 acres | ₹4.5 crore |
| Early planning filed 13 Feb 2023 (this page) | Cleared for impact study | 1.1 acres | ₹4.5 crore |
Where it is
Rasulpur, Unchahar, Rae Bareli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Waste management project by Ferrosang Enviro Solutions Private Limited — lapsed, 0 m away
- Waste management project by Ferrosang Enviro Solutions Private Limited — environmental approval granted, 0 m away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 8.2 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Bharat… — in-principle approval, conditions pending, 9.5 km away
- Feroze Gandhi Unchahar Thermal Power Station, Stage - II (2x210MW) — environmental approval granted, 13.3 km away
- Expansion by addition of 500 MW (Stage-IV) Coal Based Thermal Power Plant at… — environmental approval granted, 13.3 km away
- 1x210 MW Feroze Gandhi Unchahar Thermal Power Project (FGUTPP) Stage-III… — returned to applicant, 13.3 km away
- Feroze Gandhi Unchahar Thermal Power Project, Stage-I — lapsed, 13.4 km away
All 3 Ferrosang Enviro Solutions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.