What is Developing? Open the mapMap

Returned to applicantPower · Rae Bareli, Uttar Pradesh

1x210 MW Feroze Gandhi Unchahar Thermal Power Project (FGUTPP) Stage-III expansion at Unchahar, Distt. Raebareli, Uttar Pradesh of NTPC Ltd

1x210 MW Feroze Gandhi Unchahar Thermal Power Project (FGUTPP) Stage-III expansion at Unchahar, Distt. Raebareli, Uttar Pradesh of NTPC Ltd is a proposed power project in Nirajanpur, Unchahar, Rae Bareli, Uttar Pradesh. The site covers 2,203 acres. Its stated project cost is ₹979 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 20 Apr 2026).

See it on the live map All projects in Rae Bareli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusReturned to applicant
Status since20 Apr 2026
Application filed13 Mar 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorPower
ApplicantNTPC Limited (NTPC)
Land area2,203 acres (891.5 ha)
Project cost₹979 crore
Village / localityNirajanpur
Taluk / tehsilUnchahar
DistrictRae Bareli
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04221

In context

5 applications in Rae Bareli since January 2022 are in the same category (Power): 2 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nirajanpur, Unchahar, Rae Bareli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from NTPC Limited (NTPC) in Rae Bareli

5 NTPC projects in Rae Bareli
All 129 NTPC projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.