What is Developing? Open the mapMap

LapsedPower · Rae Bareli, Uttar Pradesh

Feroze Gandhi Unchahar Thermal Power Project, Stage-I

Feroze Gandhi Unchahar Thermal Power Project, Stage-I is a lapsed power project in Arkha Ahatmali, Unchahar, Rae Bareli, Uttar Pradesh. The site covers 2,198 acres. Its stated project cost is ₹1,054.8 crore. As of 27 Nov 2026, its status is “Lapsed” (since 14 Jan 2026).

See it on the live map All projects in Rae Bareli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since14 Jan 2026
Application filed16 Jun 2025
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorPower
ApplicantNTPC Limited (NTPC)
Land area2,198 acres (889.5 ha)
Project cost₹1,054.8 crore
Village / localityArkha Ahatmali
Taluk / tehsilUnchahar
DistrictRae Bareli
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03561

In context

5 applications in Rae Bareli since January 2022 are in the same category (Power): 2 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Arkha Ahatmali, Unchahar, Rae Bareli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from NTPC Limited (NTPC) in Rae Bareli

5 NTPC projects in Rae Bareli
All 129 NTPC projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.