What is Developing? Open the mapMap

LapsedMining · Mirzapur, Uttar Pradesh

Proposed "Building Stone (Sand Stone)" Project at Gata No.- 180/2, Village- Bhagotidei, Tehsil- Chunar, District- Mirzapur, U.P. (Leased Area : 1.01 ha./ 2.50 Acre), Lessee- Mohd Shamshad S/o Shri Mohd Iliyas

Proposed "Building Stone (Sand Stone)" Project at Gata No.- 180/2, Village- Bhagotidei, Tehsil- Chunar, District- Mirzapur, U.P. (Leased Area : 1.01 ha./ 2.50 Acre), Lessee- Mohd Shamshad S/o Shri Mohd Iliyas is a lapsed mining project in Bhagauti Dei, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 12 Dec 2025).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Building Stone (Sand Stone)" Project at Gata No.- 180/2, Village- Bhagotidei, Tehsil- Chunar, District- Mirzapur, U.P. (Leased Area : 1.01 ha./ 2.50 Acre), Lessee- Mohd Shamshad S/o Shri Mohd Iliyas is a lapsed mining project in Bhagauti Dei, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.

Who is building it?

The applicant is Mohd Shamshad.

Has it been approved?

No. The application was lapsed on 12 Dec 2025, so it is no longer under consideration.

Where is it?

In Bhagauti Dei, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 4 Nov 2024.

Project details

StatusLapsed
Status since12 Dec 2025
Application filed4 Nov 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMohd Shamshad
Land area2.5 acres (1 ha)
Project cost₹65 lakh
Village / localityBhagauti Dei
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02291

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.

7 other mining leases have applied within 500 m of this site; together with this one they cover 23 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 80 mining leases have applied within 5 km.

Where it is

Bhagauti Dei, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.