One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Bhola Ram Papers & Power Pvt Ltd Unit-2 from 100 TPD to 200 TPD Deinking…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Jan 2023 |
| Application filed | 24 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bhola Ram Papers & Power Private Limited |
| Project cost | ₹33 crore |
| Village / locality | Amarpur Kashi |
| Taluk / tehsil | Bilari |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01341 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 May 2024 | Environmental approval granted | ₹33 crore | |
| Early planning filed 24 Jan 2023 (this page) | Cleared for impact study | ₹33 crore |
In context
20 applications in Moradabad since January 2022 are in the same category (Industry): 13 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval.
Where it is
Amarpur Kashi, Bilari, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Bhola Ram Papers & Power Pvt Ltd Unit-2 from 100 TPD to 200 TPD… — environmental approval granted, 0 m away
- Proposed Retail Outlet by Hindustan Petroleum Corp. Ltd. at Km. Ch. 28.047 on… — forest land use approved, 5.3 km away
- Area: 0.9224 Ha. "Ordinary Soil Excavation" Project at Gata No.- 364, 366,… — lapsed, 7.7 km away
- Expansion of Existing Molasses Based Distillery Plant from 40 KLD To 60 KLD by… — under environmental review, 8.1 km away
- "Ordinary Soil Mining Project" at Gata 70, 113, 116, 117 & 118 — environmental approval granted, 9 km away
- Area: 2.481 Ha. "Ordinary Soil Excavation" Project at Gata No.– 64, 267, 270,… — environmental approval granted, 12.8 km away
- Re-Diversion of Forest Land for Laying of Reliance Jio Optical Fibre Cable — lapsed, 12.8 km away
- Proposed "Ordinary Soil Excavation" Project at Area: 1.700 Ha. "Ordinary Soil… — environmental approval granted, 13.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.