Project details
| Official title | Area: 0.9224 Ha. "Ordinary Soil Excavation" Project at Gata No.- 364, 366, 368, 365, 370 in the Village -Abhanpur Narauli, Tehsil- Bilari, District- Moradabad, Uttar Pradesh |
|---|---|
| Status | Lapsed |
| Status since | 17 Nov 2025 |
| Application filed | 11 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Arvind Choudhary |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹11 lakh |
| Village / locality | Abhanpur Narauli |
| Taluk / tehsil | Bilari |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03751 |
In context
38 applications in Moradabad since January 2022 are in the same category (Mining): 33 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.3 acres, this one is smaller than 68% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Abhanpur Narauli, Bilari, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Molasses Based Distillery Plant from 40 KLD To 60 KLD by… — under environmental review, 3.6 km away
- Area: 2.481 Ha. "Ordinary Soil Excavation" Project at Gata No.– 64, 267, 270,… — environmental approval granted, 5.2 km away
- Proposed Retail Outlet by Hindustan Petroleum Corp. Ltd. at Km. Ch. 28.047 on… — forest land use approved, 5.2 km away
- Proposed "Ordinary Soil Excavation" Project at Area: 1.700 Ha. "Ordinary Soil… — environmental approval granted, 5.7 km away
- Expansion of Bhola Ram Papers & Power Pvt Ltd Unit-2 from 100 TPD to 200 TPD… — environmental approval granted, 7.7 km away
- Expansion of Bhola Ram Papers & Power Pvt Ltd Unit-2 from 100 TPD to 200 TPD… — cleared for impact study, 7.7 km away
- Re-Diversion of Forest Land for Laying of Reliance Jio Optical Fibre Cable — lapsed, 7.9 km away
- Proposed Protected Forest Land to be diverted for Laying of underground… — in-principle approval, conditions pending, 9.9 km away
More from Arvind Choudhary in Moradabad
- Proposed "Ordinary Soil Mining" Project at Gata No.- 460, 461, 462, 463, 464,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.