Project details
| Official title | Expansion of Existing Molasses Based Distillery Plant from 40 KLD To 60 KLD along with 2.5 MW Co-Gen Power and Establishment of new 200 KLD Grain (Non-molasses) Based Distillery Plant (RS/ENA/Ethanol) along with 7.0 MW Co-Gen Power within Existing Premises at Village: Raja Ka Sahaspur Tehsil: Bilari, District: Moradabad (Uttar Pradesh) - 244415 by M/s Allied Blenders and Distillers Limited |
|---|---|
| Status | Under environmental review |
| Status since | 16 Oct 2026 |
| Application filed | 6 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Allied Blenders and Distillers Limited |
| Land area | 27.9 acres (11.3 ha) |
| Project cost | ₹5 crore |
| Village / locality | Bahadarpur |
| Taluk / tehsil | Bilari |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04009 |
In context
20 applications in Moradabad since January 2022 are in the same category (Industry): 13 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 27.9 acres, this one is larger than 67% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bahadarpur, Bilari, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Retail Outlet by Hindustan Petroleum Corp. Ltd. at Km. Ch. 28.047 on… — forest land use approved, 3.4 km away
- Area: 0.9224 Ha. "Ordinary Soil Excavation" Project at Gata No.- 364, 366,… — lapsed, 3.6 km away
- Re-Diversion of Forest Land for Laying of Reliance Jio Optical Fibre Cable — lapsed, 5 km away
- Area: 2.481 Ha. "Ordinary Soil Excavation" Project at Gata No.– 64, 267, 270,… — environmental approval granted, 5.9 km away
- Proposed "Ordinary Soil Excavation" Project at Area: 1.700 Ha. "Ordinary Soil… — environmental approval granted, 6.9 km away
- Proposed Protected Forest Land to be diverted for Laying of underground… — in-principle approval, conditions pending, 7 km away
- Expansion of Bhola Ram Papers & Power Pvt Ltd Unit-2 from 100 TPD to 200 TPD… — environmental approval granted, 8.1 km away
- Expansion of Bhola Ram Papers & Power Pvt Ltd Unit-2 from 100 TPD to 200 TPD… — cleared for impact study, 8.1 km away
All 4 Allied Blenders and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.