Quick answers
What is this project?
Sand/Morrum Mine from Riverbed of Dhasan River, Village- Jigni, Gata No.- 01 Khand No.- 01, lease area- 25.00 Ha., Tehsil- Rath, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Satyaom Developers Private Limited (Director- Shri Satya Prakash Gupta S/o Shri Om Prakash Gupta) is a proposed mining project in Jigini, Rath, Hamirpur, Uttar Pradesh. The site covers 61.8 acres.
Who is building it?
The applicant is Satyaom Developers Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Jigini, Rath, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4.3 crore and a site of 61.8 acres.
When was it filed?
The application was filed on 17 Apr 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mine from Riverbed of Dhasan River, Village- Jigni, Gata No.- 01 Khand No.-…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 May 2025 |
| Application filed | 17 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Satyaom Developers Private Limited |
| Land area | 61.8 acres (25 ha) |
| Project cost | ₹4.3 crore |
| Village / locality | Jigini |
| Taluk / tehsil | Rath |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03045 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Oct 2025 | Environmental approval granted | 61.8 acres | ₹4.3 crore |
| Early planning filed 17 Apr 2025 (this page) | Cleared for impact study | 61.8 acres | ₹4.3 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 61.8 acres, this one is larger than 65% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Jigini, Rath, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Jigni, Gata No.- 01… — environmental approval granted, 0 m away
- Proposed Project of Sand/Morrum Mining from Riverbed of Dhasan River at Gata… — under environmental review, 1.5 km away
- Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — withdrawn, 1.5 km away
- "Sand/Morrum Mining" from Riverbed of Dhasan River — under environmental review, 2.4 km away
- "Sand/Morrum Mining" from Riverbed of Dhasan River — cleared for impact study, 2.4 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Chandwari Ghurauli,… — environmental approval granted, 2.7 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Chandwari Ghurauli,… — cleared for impact study, 2.7 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 3 km away
All 3 Satyaom Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.