Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 May 2023 |
| Application filed | 6 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ajay Pandey |
| Land area | 11 acres (4.5 ha) |
| Project cost | ₹4.7 crore |
| Village / locality | Barawatola |
| Taluk / tehsil | Dudhi |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01376 |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11 acres, this one is larger than 78% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 29.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Barawatola, Dudhi, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Gitty/Boulder (Dolostone/Granite) Mining at Araji No. 1028 क, 1028 ड,… — under environmental review, 250 m away
- Proposed Gitty/Boulder (Dolostone/Granite) Mining at Araji No. 1028 क, 1028 ड,… — cleared for impact study, 250 m away
- Proposed "Gitty/Boulder (Dolostone/Granite) Mining Project" at Gata No. – 1030… — under environmental review, 250 m away
- Proposed "Gitty/Boulder (Dolostone/Granite) Mining Project" at Gata No. – 1030… — cleared for impact study, 250 m away
- Proposed project of Gitti/Boulder (Granite) Mining project at Arazi No. – 996,… — under environmental review, 500 m away
- Proposed project of Gitti/Boulder (Granite) Mining project at Arazi No. –… — environmental approval granted, 1.3 km away
- Proposed project of Gitti/Boulder (Granite) Mining project at Arazi No. –… — environmental approval granted, 1.4 km away
- Proposed Gitty/Boulder (Dolostone) Mining at Araji No. 781ख, 783ग, 783घ, 787ग,… — environmental approval granted, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.