What is Developing? Open the mapMap

Under environmental reviewMining · Sonbhadra, Uttar Pradesh

Proposed Gitty/Boulder (Dolostone/Granite) Mining at Araji No. 1028 क, 1028 ड, 1028 ड़, 1028 चमि०, 1028 ज, 1027, (Leased Area- 3.429 Ha.) Village: Barwatola, Tehsil: Dudhi, Dist: Sonbhadra, Uttar Pradesh .Land Owner – Shri Rohit Nath Dubey,Leased Area- 3.429 Ha.

Proposed Gitty/Boulder (Dolostone/Granite) Mining at Araji No. 1028 क, 1028 ड, 1028 ड़, 1028 चमि०, 1028 ज, 1027, (Leased Area- 3.429 Ha.) Village: Barwatola, Tehsil: Dudhi, Dist: Sonbhadra, Uttar Pradesh .Land Owner – Shri Rohit Nath Dubey,Leased Area- 3.429 Ha is a proposed mining project in Barawa Tola, Dudhi, Sonbhadra, Uttar Pradesh. The site covers 8.5 acres. Its stated project cost is ₹99 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 6 Nov 2026).

See it on the live map All projects in Sonbhadra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Gitty/Boulder (Dolostone/Granite) Mining at Araji No. 1028 क, 1028 ड, 1028 ड़,…

Project details

StatusUnder environmental review
Status since6 Nov 2026
Application filed2 Jan 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRohit Nath Dubey
Land area8.5 acres (3.4 ha)
Project cost₹99 lakh
Village / localityBarawa Tola
Taluk / tehsilDudhi
DistrictSonbhadra
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04742

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 2 Jan 2026 (this page)Under environmental review8.5 acres₹99 lakh
Early planning filed 17 Apr 2025Cleared for impact study8.5 acres₹99 lakh

In context

209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.5 acres, this one is larger than 73% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 29.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.

Where it is

Barawa Tola, Dudhi, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.