Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 31 Jan 2026 |
| Application filed | 30 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ramesh Singh |
| Land area | 12.7 acres (5.2 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Karam Ghati |
| Taluk / tehsil | Dudhi |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02858 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Oct 2025 (this page) | Environmental approval granted | 12.7 acres | ₹99 lakh |
| Early planning filed 9 Apr 2025 | Cleared for impact study | 12.7 acres | ₹99 lakh |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.7 acres, this one is larger than 81% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Karam Ghati, Dudhi, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Gitty/Boulder (Dolostone) Mining at Araji No. 781ख, 783ग, 783घ, 787ग,… — cleared for impact study, 0 m away
- Proposed project of Gitti/Boulder (Granite) Mining project at Arazi No. –… — environmental approval granted, 2.1 km away
- Proposed project of Gitti/Boulder (Granite) Mining project at Arazi No. – 996,… — under environmental review, 2.7 km away
- Proposed Gitty/Boulder (Dolostone/Granite) Mining at Araji No. 1028 क, 1028 ड,… — under environmental review, 3 km away
- Proposed Gitty/Boulder (Dolostone/Granite) Mining at Araji No. 1028 क, 1028 ड,… — cleared for impact study, 3 km away
- Proposed Khanda Boulder (Dolostone) mining project at Arazi No. 1028 Jha, 1030… — environmental approval granted, 3.1 km away
- Proposed "Gitty/Boulder (Dolostone/Granite) Mining Project" at Gata No. – 1030… — under environmental review, 3.2 km away
- Proposed "Gitty/Boulder (Dolostone/Granite) Mining Project" at Gata No. – 1030… — cleared for impact study, 3.2 km away
More from Ramesh Singh in Sonbhadra
- Billi Markundi Khanda, Boulder (Dolostone) Mining Project (Area 1.383 Ha.) — environmental approval granted
- Billi Markundi, Gitti, Boulder (Dolo Stone) Mining Project (Area 0.9918 Ha ) — environmental approval granted
- Billi Markundi Khanda, Boulder (Dolostone) Mining Project (Area 1.383 Ha.) — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.