One of 2 filings for this project. The project's main page, with every filing and where each stands: Amended Bharat Net Project ( Khekra - Baghpat section Meerut division)
Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Mar 2026 |
| Application filed | 9 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Rail Vikas Nigam Limited (RVNL) |
| Forest land | 80 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Badshahpur Sarauli |
| Taluk / tehsil | Ghaziabad |
| District | Ghaziabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05888 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Feb 2026 (this page) | Lapsed | ₹1.5 crore | |
| New project filed 9 Feb 2026 | Lapsed | ₹1.5 crore |
In context
6 applications in Ghaziabad since January 2022 are in the same category (Telecom): 0 approved, 0 filed or under review, and 6 withdrawn, lapsed or rejected.
Where it is
Badshahpur Sarauli, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amended Bharat Net Project ( Khekra - Baghpat section Meerut division) — lapsed, 0 m away
- Capacity Expansion of Jamnagar-Loni Pipeline (JLPL) — under forest review, 5.9 km away
- Diversion of Forest land for new BPCL retail outlet at Khasra No. 23Mi,… — lapsed, 6.6 km away
- Environmental Clearance for Integrated solid waste management facility — cleared for impact study, 10.7 km away
- Environmental Clearance for Integrated solid waste management facility — returned to applicant, 10.7 km away
- Ordinary Sand Category-1 Mining from Yamuna Riverbed — environmental approval granted, 12 km away
- Ordinary Sand Category-1 Mining from Yamuna Riverbed — cleared for impact study, 12 km away
- Sand mine, Gata No. 8mi, 9 mi, 10mi, 11mi, 12 mi, 13mi, 17mi, 18, 19, 20mi,… — cleared for impact study, 12.7 km away
More from Rail Vikas Nigam Limited (RVNL) in Ghaziabad
- Amended BharatNet Project (Marehra-Etah) — lapsed
- Amended BharatNet Project (Rajapur-Ghaziabad) — lapsed
- Amended BharatNet Project (Muradnagar-Ghaziabad) — lapsed
5 Rail Vikas Nigam (RVNL) projects in Ghaziabad
All 82 Rail Vikas Nigam (RVNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.