Proposed Project of riverbed " Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1782, 1783 Khand No. 03, Area 8.906 ha

Proposed Project of riverbed " Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1782, 1783 Khand No. 03, Area 8.906 ha is a proposed mining project in Monana, Orai, Jalaun, Uttar Pradesh. The site covers 22 acres. Its stated project cost is ₹3.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 1 Jul 2024).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed " Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1782, 1783 Khand No. 03, Area 8.906 ha is a proposed mining project in Monana, Orai, Jalaun, Uttar Pradesh. The site covers 22 acres.

Who is building it?

The applicant is Manoj Kumar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 1 Jul 2024), as of 27 Nov 2026.

Where is it?

In Monana, Orai, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹3.5 crore and a site of 22 acres.

When was it filed?

The application was filed on 8 Apr 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed " Sand/Morrum Mining" on the riverbed of Betwa River at…

Project details

Official titleProposed Project of riverbed " Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1782, 1783 Khand No. 03, Area 8.906 ha in Village- Mohana, Tehsil- Orai, District- Jalaun, Uttar Pradesh
StatusCleared for impact study
Status since1 Jul 2024
Application filed8 Apr 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantManoj Kumar
Land area22 acres (8.9 ha)
Project cost₹3.5 crore
Village / localityMonana
Taluk / tehsilOrai
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01459

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 14 Nov 2024Environmental approval granted22 acres₹3.5 crore
Early planning filed 8 Apr 2024 (this page)Cleared for impact study22 acres₹3.5 crore

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22 acres, this one is smaller than 89% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 66.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Monana, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.