What is Developing? Open the mapMap

Environmental approval grantedMining · Jalaun, Uttar Pradesh

Proposed Project of riverbed " Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1782, 1783 Khand No. 02, Area 8.906 ha

Proposed Project of riverbed " Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1782, 1783 Khand No. 02, Area 8.906 ha is an approved mining project in Monana, Orai, Jalaun, Uttar Pradesh. The site covers 22 acres. Its stated project cost is ₹4.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Feb 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed " Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1782, 1783 Khand No. 02, Area 8.906 ha is an approved mining project in Monana, Orai, Jalaun, Uttar Pradesh. The site covers 22 acres.

Who is building it?

The applicant is Santosh Kumar.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.

Where is it?

In Monana, Orai, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹4.2 crore and a site of 22 acres.

When was it filed?

The application was filed on 24 Nov 2025.

Project details

Official titleProposed Project of riverbed " Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1782, 1783 Khand No. 02, Area 8.906 ha in Village- Mohana, Tehsil- Orai, District- Jalaun, Uttar Pradesh of Shri Santosh Kumar
StatusEnvironmental approval granted
Status since9 Feb 2026
Application filed24 Nov 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSantosh Kumar
Land area22 acres (8.9 ha)
Project cost₹4.2 crore
Village / localityMonana
Taluk / tehsilOrai
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03487

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Nov 2025 (this page)Environmental approval granted22 acres₹4.2 crore
Early planning filed 5 Jun 2024Cleared for impact study22 acres₹4.2 crore

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22 acres, this one is smaller than 89% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 66.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Monana, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.