Environmental approval grantedMining · Banda, Uttar Pradesh

Proposed riverbed sand/morrum mining project from Ken River of M/s A.K. Singh Contractor, Proprietor- Shri Arun Kumar Singh S/o Shri Shayam Singh, located at Gata No. 721, 722 & 723, Village- Kolawalraipur, Tehsil- Naraini, District- Banda, Uttar Pradesh. Sanctioned Lease Area- 49.42 acre (20.00 ha).

Proposed riverbed sand/morrum mining project from Ken River of M/s A.K. Singh Contractor, Proprietor- Shri Arun Kumar Singh S/o Shri Shayam Singh, located at Gata No. 721, 722 & 723, Village- Kolawalraipur, Tehsil- Naraini, District- Banda, Uttar Pradesh. Sanctioned Lease Area- 49.42 acre (20.00 ha) is an approved mining project in Kolawal Raipur, Naraini, Banda, Uttar Pradesh. The site covers 49.4 acres. Its stated project cost is ₹3.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 May 2025).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed riverbed sand/morrum mining project from Ken River of M/s A.K. Singh Contractor, Proprietor- Shri Arun Kumar Singh S/o Shri Shayam Singh, located at Gata No. 721, 722 & 723, Village- Kolawalraipur, Tehsil- Naraini, District- Banda, Uttar Pradesh. Sanctioned Lease Area- 49.42 acre (20.00 ha) is an approved mining project in Kolawal Raipur, Naraini, Banda, Uttar Pradesh. The site covers 49.4 acres.

Who is building it?

The applicant is Arun Kumar Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 May 2025), as of 27 Nov 2026.

Where is it?

In Kolawal Raipur, Naraini, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹3.2 crore and a site of 49.4 acres.

When was it filed?

The application was filed on 26 Dec 2024.

Project details

StatusEnvironmental approval granted
Status since28 May 2025
Application filed26 Dec 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantArun Kumar Singh
Land area49.4 acres (20 ha)
Project cost₹3.2 crore
Village / localityKolawal Raipur
Taluk / tehsilNaraini
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01461

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 26 Dec 2024 (this page)Environmental approval granted49.4 acres₹3.2 crore
Early planning filed 14 May 2024Cleared for impact study49.4 acres₹3.2 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.4 acres, this one is larger than 69% of them.

No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.

Where it is

Kolawal Raipur, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.