Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Ken River of M/s A.K. Singh Contractor, Proprietor- Shri Arun Kumar Singh S/o Shri Shayam Singh, located at Gata No. 721, 722 & 723, Village- Kolawalraipur, Tehsil- Naraini, District- Banda, Uttar Pradesh. Sanctioned Lease Area- 49.42 acre (20.00 ha) is a proposed mining project in Kolawal Raipur, Naraini, Banda, Uttar Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Arun Kumar Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 15 Oct 2024), as of 27 Nov 2026.
Where is it?
In Kolawal Raipur, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.2 crore and a site of 49.4 acres.
When was it filed?
The application was filed on 14 May 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Ken River of M/s A.K. Singh…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 15 Oct 2024 |
| Application filed | 14 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Arun Kumar Singh |
| Land area | 49.4 acres (20 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Kolawal Raipur |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01910 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Dec 2024 | Environmental approval granted | 49.4 acres | ₹3.2 crore |
| Early planning filed 14 May 2024 (this page) | Cleared for impact study | 49.4 acres | ₹3.2 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.4 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Kolawal Raipur, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed sand/morrum mining project from Ken River of M/s A.K. Singh… — environmental approval granted, 0 m away
- Proposed Sand/Morrum Mining Project on Ken River Bed — environmental approval granted, 1 km away
- "Morrum Mining" at Village- Manpur Khurd, Gata No.- 165, 164, Lease Area-… — more information requested, 1.9 km away
- Environmental clearance of Morrum removal from Bhumidhari/ Agricultural land/… — under environmental review, 2.2 km away
- Sand/Morrum Mining Project at Gata No. 04, lease area of 10.00 hectares… — environmental approval granted, 2.3 km away
- Sand/Morrum Mining Project at Gata No. 04, lease area of 10.00 hectares… — cleared for impact study, 2.3 km away
- Sand/Moram Mining at Ken River Bed , Gata No.- 492/13, Area – 24.00 Ha/59.30… — under environmental review, 3 km away
- Nihalpur Syodha Sand/Morrum Mining Project Area : 24.0 ha (59.30 Acre) — environmental approval granted, 3 km away
About this information