What is Developing? Open the mapMap

Environmental approval grantedMining · Banda, Uttar Pradesh

Sand/Morrum Mining Project at Gata No. 04, lease area of 10.00 hectares ,Village – Kolawal Raipur, Tehsil – Naraini, District – Banda, Uttar Pradesh

Sand/Morrum Mining Project at Gata No. 04, lease area of 10.00 hectares ,Village – Kolawal Raipur, Tehsil – Naraini, District – Banda, Uttar Pradesh is an approved mining project in Kabrai Ka Purwa, Naraini, Banda, Uttar Pradesh. The site covers 24.7 acres. Its stated project cost is ₹95 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 18 Oct 2026).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand/Morrum Mining Project at Gata No. 04, lease area of 10.00 hectares ,Village – Kolawal Raipur, Tehsil – Naraini, District – Banda, Uttar Pradesh is an approved mining project in Kabrai Ka Purwa, Naraini, Banda, Uttar Pradesh. The site covers 24.7 acres.

Who is building it?

The applicant is Ram Kumar Tripathi.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 18 Oct 2026), as of 27 Nov 2026.

Where is it?

In Kabrai Ka Purwa, Naraini, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹95 lakh and a site of 24.7 acres.

When was it filed?

The application was filed on 24 Jun 2026.

Project details

StatusEnvironmental approval granted
Status since18 Oct 2026
Application filed24 Jun 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRam Kumar Tripathi
Land area24.7 acres (10 ha)
Project cost₹95 lakh
Village / localityKabrai Ka Purwa
Taluk / tehsilNaraini
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04841

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Jun 2026 (this page)Environmental approval granted24.7 acres₹95 lakh
Early planning filed 11 Sept 2025Cleared for impact study24.7 acres₹95 lakh

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 24.7 acres, this one is smaller than 69% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Kabrai Ka Purwa, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.