What is Developing? Open the mapMap

Cleared for impact studyMining · Jalaun, Uttar Pradesh

"Sand/Morrum" Mine from Riverbed of Betwa River

"Sand/Morrum" Mine from Riverbed of Betwa River is a proposed mining project in Himanpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 19.4 acres. Its stated project cost is ₹94 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Jul 2024).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum" Mine from Riverbed of Betwa River?

"Sand/Morrum" Mine from Riverbed of Betwa River is a proposed mining project in Himanpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 19.4 acres.

Who is building it?

The applicant is Abhedya Infra Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 3 Jul 2024), as of 27 Nov 2026.

Where is it?

In Himanpura, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹94 lakh and a site of 19.4 acres.

When was it filed?

The application was filed on 20 Apr 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum" Mine from Riverbed of Betwa River

Project details

Official title"Sand/Morrum" Mine from Riverbed of Betwa River at Village- Himanpura, Gata No.- 240, Khand No.- 01, Lease Area- 7.850 ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s Abhedya Infra Pvt. Ltd. (Director- Shri Ankit Gupta)
StatusCleared for impact study
Status since3 Jul 2024
Application filed20 Apr 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAbhedya Infra Private Limited
Land area19.4 acres (7.9 ha)
Project cost₹94 lakh
Village / localityHimanpura
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01503

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 7 Nov 2024Environmental approval granted19.4 acres₹94 lakh
Early planning filed 20 Apr 2024 (this page)Cleared for impact study19.4 acres₹94 lakh

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 19.4 acres, this one is smaller than 91% of them.

No other mining lease on record is within 500 m of this site; 25 have applied within 5 km.

Where it is

Himanpura, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Abhedya Infra Private Limited in Jalaun

All 4 Abhedya Infra projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.