What is Developing? Open the mapMap

Under environmental reviewMining · Jalaun, Uttar Pradesh

"Sand/Morrum Mining" from Riverbed of Betwa River

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Himanpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 30 Jul 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Betwa River?

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Himanpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres.

Who is building it?

The applicant is H N Infra Build Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Himanpura, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 50 acres.

When was it filed?

The application was filed on 18 Mar 2026.

Project details

Official title"Sand/Morrum Mining" from Riverbed of Betwa River at Village- Hemanpura, Gata No.- 240 (Khand No.- 2), lease area- 20.242 ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s H.N. Infra Build Pvt. Ltd. (Director- Smt Tara Devi)
StatusUnder environmental review
Status since30 Jul 2026
Application filed18 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantH N Infra Build Private Limited
Land area50 acres (20.2 ha)
Project cost₹1.5 crore
Village / localityHimanpura
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04832

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 21 Oct 2026Initial checks50 acres₹1.5 crore
Early planning filed 18 Mar 2026 (this page)Under environmental review50 acres₹1.5 crore

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 83 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.

Where it is

Himanpura, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.