Quick answers
What is this project?
Riverbed Sand/Morrum Mining Project having lease area 20.20 ha (50.0 acre) along River Betwa in Gata No 240, Khand No-02 is a proposed mining project in Himanpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 49.9 acres.
Who is building it?
The applicant is Ravi Panjwani.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Nov 2023), as of 27 Nov 2026.
Where is it?
In Himanpura, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh and a site of 49.9 acres.
When was it filed?
The application was filed on 22 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Sand/Morrum Mining Project having lease area 20.20 ha (50.0 acre) along River…
Project details
| Official title | Riverbed Sand/Morrum Mining Project having lease area 20.20 ha (50.0 acre) along River Betwa in Gata No 240, Khand No-02 at Village -Himanpura, Tehsil- Kalpi, District- Jalaun, U. P. of Shri Ravi Panjwani |
|---|---|
| Status | Cleared for impact study |
| Status since | 22 Nov 2023 |
| Application filed | 22 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ravi Panjwani |
| Land area | 49.9 acres (20.2 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Himanpura |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00970 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Oct 2024 | Environmental approval granted | 49.9 acres | ₹75 lakh |
| Early planning filed 22 Nov 2023 (this page) | Cleared for impact study | 49.9 acres | ₹75 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 49.9 acres, this one is larger than 64% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 82.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.
Where it is
Himanpura, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand/Morrum Mining Project having lease area 20.20 ha (50.0 acre)… — environmental approval granted, 0 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — initial checks, 0 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 0 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — under environmental review, 400 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 400 m away
- Proposed Project of "Sand/Morrum Mining" at Gata No. 240 (Khand No. 04),… — environmental approval granted, 750 m away
- Proposed Project of "Sand/Morrum Mining" at Gata No. 240 (Khand No. 04),… — cleared for impact study, 750 m away
- "Sand/Morrum" Mine from Riverbed of Betwa River — environmental approval granted, 900 m away
More from Ravi Panjwani in Jalaun
- SAND/MORRUM MINING ALONG YAMUNA RIVERBED OVER AN AREA OF 15 ha. AT GATA NO.… — under environmental review
- Proposed Sand/Morrum Mining Project along Yamuna Riverbed — environmental approval granted
- Proposed Sand/Morrum Mining Project along Yamuna Riverbed — environmental approval granted
- Proposed Sand/Morrum Mining Project along Yamuna Riverbed — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.