Project details
| Official title | Environmental Clearance of Proposed Ordinary Earth excavation from Khasra/Gata Nos 60, 65 & 66 Total Area – 1.34 ha at Village-Behda-Jorawar, Tehsil- Mitauli, District - Kheri, Uttar Pradesh of Shri Lalit S/o Shri Manoj |
|---|---|
| Status | Environmental approval granted |
| Status since | 20 Mar 2025 |
| Application filed | 28 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Lalit |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Behra Jerawar |
| Taluk / tehsil | Mohammdi |
| District | Kheri |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01518 |
In context
56 applications in Kheri since January 2022 are in the same category (Mining): 37 approved, 15 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.3 acres, this one is smaller than 71% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Behra Jerawar, Mohammdi, Kheri, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Earth excavation from Khasra/Gata No. 841 & 633, Total Area-1.1420 ha — under environmental review, 2.3 km away
- Laying of 12" Carbon steel Gas Pipeline along the road by BPCL on… — forest land use approved, 6.3 km away
- Proposed 300 KLPD (2x150 KLPD) Grain/Molasses/Cane juice based distillery, 15… — cleared for impact study, 6.7 km away
- Dhakora Soil Mining Project — environmental approval granted, 7.8 km away
- Siyaraha Soil Mining Project — under environmental review, 11.5 km away
- Sahora Soil Mining Project — environmental approval granted, 12.4 km away
- Laying of 12" Carbon steel Gas Pipeline along the road by BPCL on… — forest land use approved, 13.8 km away
- Hazratpur Ordinary Soil Mining Project — environmental approval granted, 22.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.