Project details
| Status | Forest land use approved |
|---|---|
| Status since | 19 Sept 2025 |
| Application filed | 22 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 25.6 acres (10.4 ha) |
| Forest land | 3.8 acres (1.5 ha) |
| Project cost | ₹25 crore |
| Village / locality | Chapartala |
| Taluk / tehsil | Mohammdi |
| District | Kheri |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06294 |
In context
6 applications in Kheri since January 2022 are in the same category (Pipelines): 2 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chapartala, Mohammdi, Kheri, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Siyaraha Soil Mining Project — under environmental review, 2.6 km away
- Proposed 300 KLPD (2x150 KLPD) Grain/Molasses/Cane juice based distillery, 15… — cleared for impact study, 7.7 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Bharat… — lapsed, 10.2 km away
- Barkhera Soil Mining project — environmental approval granted, 10.7 km away
- Ordinary Earth excavation from Khasra/Gata No. 841 & 633, Total Area-1.1420 ha — under environmental review, 11.9 km away
- Dhakora Soil Mining Project — environmental approval granted, 12.5 km away
- Sahora Soil Mining Project — environmental approval granted, 12.9 km away
- Environmental Clearance of Proposed Ordinary Earth excavation from Khasra/Gata… — environmental approval granted, 13.8 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Kheri
- Proposed Protected Forest Land to Be Diverted by Bharat Petroleum Corporation… — more information requested
- Protected Forest Land proposed for diversion for Entry/Exit approach to Bharat… — lapsed
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — more information requested
- Lakhimpur Kheri State Uttar Pradesh — lapsed
- City Gas Network Inlakhimpur Kheri District in the State of Uttar Pradesh — lapsed
- CGD Network GA-11A.01 — forest land use approved
8 Bharat Petroleum Corporation (BPCL) projects in Kheri
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.