What is Developing? Open the mapMap

Cleared for impact studyIndustry · Kheri, Uttar Pradesh

Proposed 300 KLPD (2x150 KLPD) Grain/Molasses/Cane juice based distillery, 15 KLPD Malt Spirit plant by M/s. Globus Spirits Limited

Proposed 300 KLPD (2x150 KLPD) Grain/Molasses/Cane juice based distillery, 15 KLPD Malt Spirit plant by M/s. Globus Spirits Limited is a proposed industrial project in Abbaspur, Mohammdi, Kheri, Uttar Pradesh. The site covers 36.7 acres. Its stated project cost is ₹250 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Nov 2022).

See it on the live map All projects in Kheri

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 300 KLPD (2x150 KLPD) Grain/Molasses/Cane juice based distillery, 15 KLPD Malt…

Project details

Official titleProposed 300 KLPD (2x150 KLPD) Grain/Molasses/Cane juice based distillery, 15 KLPD Malt Spirit plant along with 10 MW Co-generation power plant at Village Abbaspur, Tehsil Mitauli, District Lakhimpur Kheri, Uttar Pradesh by M/s. Globus Spirits Limited
StatusCleared for impact study
Status since29 Nov 2022
Application filed29 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantGlobus Spirits Limited
Land area36.7 acres (14.9 ha)
Project cost₹250 crore
Village / localityAbbaspur
Taluk / tehsilMohammdi
DistrictKheri
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00181

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Oct 2023Environmental approval granted36.7 acres₹250 crore
Early planning filed 29 Nov 2022 (this page)Cleared for impact study36.7 acres₹250 crore

In context

14 applications in Kheri since January 2022 are in the same category (Industry): 13 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 36.7 acres, this one is smaller than 86% of them.

Where it is

Abbaspur, Mohammdi, Kheri, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 8 Globus Spirits projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.