What is "Ordinary Earth Excavation Project" at Gata No.- 491, 525?
"Ordinary Earth Excavation Project" at Gata No.- 491, 525 is an approved mining project in Bhatpura, Hasanganj, Unnao, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Sonam Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Apr 2024), as of 27 Nov 2026.
Where is it?
In Bhatpura, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹15 lakh and a site of 0.8 acres.
When was it filed?
The application was filed on 23 Jan 2024.
Project details
| Official title | "Ordinary Earth Excavation Project" at Gata No.- 491, 525 in Village: Bhatpura, Tehsil: Hasanganj, District- Unnao, Uttar Pradesh |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Apr 2024 |
| Application filed | 23 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sonam Singh |
| Land area | 3,400 m² |
| Project cost | ₹15 lakh |
| Village / locality | Bhatpura |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01526 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.8 acres, this one is smaller than 99% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Bhatpura, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Excavation Project" at Gata No.- 918Kha, 921Ka, Village-… — environmental approval granted, 5 km away
- Ordinary Soil Mine — under environmental review, 6 km away
- Proposed Forest Fand to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 7.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to Private… — in-principle approval, conditions pending, 7.4 km away
- Academic and hostel blocks at Chandigarh University campus — environmental approval granted, 7.4 km away
- Academic and hostel blocks at Chandigarh University campus — cleared for impact study, 7.4 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 7.4 km away
- Ordinary Soil Mine — environmental approval granted, 7.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.