Quick answers
What is this project?
Proposed Forest Fand to be Diverted for Entry/Exit Approach to BPCL Retail Outlet is a lapsed fuel station in Makhdumpur, Hasanganj, Unnao, Uttar Pradesh. The site covers 0.4 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
No. The application was lapsed on 28 Dec 2025, so it is no longer under consideration.
Where is it?
In Makhdumpur, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.4 acres and 580 m² of forest land.
When was it filed?
The application was filed on 24 Nov 2025.
Project details
| Official title | Proposed Forest Fand to be Diverted for Entry/Exit Approach to BPCL Retail Outlet at Village:- Makhdoompur, Tehsil:- Hasanganj, District:- Unnao. |
|---|---|
| Status | Lapsed |
| Status since | 28 Dec 2025 |
| Application filed | 24 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1,800 m² |
| Forest land | 580 m² |
| Project cost | ₹55 lakh |
| Village / locality | Makhdumpur |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-06276 |
In context
13 applications in Unnao since January 2022 are in the same category (Fuel stations): 9 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.4 acres, this one is smaller than 85% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Makhdumpur, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to Private… — in-principle approval, conditions pending, 450 m away
- Academic and hostel blocks at Chandigarh University campus — environmental approval granted, 450 m away
- Academic and hostel blocks at Chandigarh University campus — cleared for impact study, 450 m away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 500 m away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 1.9 km away
- "Ordinary Earth Mining Project" — environmental approval granted, 2 km away
- "Ordinary Soil Excavation Project" at Gata No.- 918Kha, 921Ka, Village-… — environmental approval granted, 3.1 km away
- Mining of Minor Mineral Ordinary Soil — environmental approval granted, 5.3 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Unnao
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit Approach to BPCL… — lapsed
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved
4 Bharat Petroleum Corporation (BPCL) projects in Unnao
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.