Quick answers
What is this project?
"Ordinary Earth Mining" Project at Gata No.- 82, 85, Village- Udaibhan Bhakroi, Tehsil- Hathras, District- Hathras, Uttar Pradesh. (Area-2.0090 Ha). Prop. Shri Ankush Agrawal S/O Shri Kamal Agrawal is an approved mining project in Udayman, Hathras, Uttar Pradesh. The site covers 2.3 acres.
Who is building it?
The applicant is Ankush Agrawal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Nov 2024), as of 27 Nov 2026.
Where is it?
In Udayman, Hathras, Uttar Pradesh.
How big is it?
It has a stated cost of ₹19 lakh and a site of 2.3 acres.
When was it filed?
The application was filed on 12 Jun 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Nov 2024 |
| Application filed | 12 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ankush Agrawal |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹19 lakh |
| Village / locality | Udayman |
| Taluk / tehsil | Hathras |
| District | Hathras |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01615 |
In context
47 applications in Hathras since January 2022 are in the same category (Mining): 32 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.3 acres, this one is smaller than 55% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Udayman, Hathras, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Earth Mining" Project at Gata No.- 290, Village- Timrali, Tehsil-… — lapsed, 200 m away
- "Ordinary Soil Mining" Project at Gata No.- 80मि०, 93, 94, 96, Village-… — environmental approval granted, 600 m away
- "Ordinary Soil Mining" Project at Gata No.- 98, Village- Udaibhan Bhakroi,… — environmental approval granted, 800 m away
- Diversion of P.F. land under social forestry division, Hathras for access road… — forest land use approved, 1.4 km away
- The Diversion of Road Side Protected Forest Land (0.0684 Hac.) on… — forest land use approved, 3.3 km away
- Diversion of 0.1124 Hectare of Protected Forest land under social forestry… — lapsed, 3.9 km away
- "Ordinary Soil Mining" Project at Gata No.- 72, Village- Rayak, Tehsil-… — environmental approval granted, 4.3 km away
- 44 Court rooms for Integrated Court Complex — cleared for impact study, 6.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.