Quick answers
What is this project?
"Ordinary Soil Mining" Project at Gata No.- 72, Village- Rayak, Tehsil- Hathras, District- Hathras, Uttar Pradesh (Area-0.6400 Ha) Shri Sandeep Kumar is an approved mining project in Raik, Hathras, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Sandeep Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Jul 2026), as of 27 Nov 2026.
Where is it?
In Raik, Hathras, Uttar Pradesh.
How big is it?
It has a stated cost of ₹12 lakh and a site of 1.6 acres.
When was it filed?
The application was filed on 27 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Jul 2026 |
| Application filed | 27 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sandeep Kumar |
| Land area | 1.6 acres (0.6 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Raik |
| Taluk / tehsil | Hathras |
| District | Hathras |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04732 |
In context
47 applications in Hathras since January 2022 are in the same category (Mining): 32 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.6 acres, this one is smaller than 72% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Raik, Hathras, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion of Road Side Protected Forest Land (0.0684 Hac.) on… — forest land use approved, 3.2 km away
- Diversion of 0.1124 Hectare of Protected Forest land under social forestry… — lapsed, 3.3 km away
- Diversion of P.F. land under social forestry division, Hathras for access road… — forest land use approved, 3.3 km away
- "Ordinary Earth Mining" Project at Gata No.- 290, Village- Timrali, Tehsil-… — lapsed, 4.1 km away
- "Ordinary Earth Mining" Project at Gata No.- 82, 85, Village- Udaibhan… — environmental approval granted, 4.3 km away
- 44 Court rooms for Integrated Court Complex — cleared for impact study, 4.7 km away
- 44 Court rooms for Integrated Court Complex — environmental approval granted, 4.7 km away
- "Ordinary Soil Mining" Project at Gata No.- 80मि०, 93, 94, 96, Village-… — environmental approval granted, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.