Quick answers
What is this project?
"Ordinary Earth Mining" Project at Gata No.- 290, Village- Timrali, Tehsil- Hathras, District- Hathras, Uttar Pradesh. (Area-0.2830Ha). Shri Ravi Kumar Goswami is a lapsed mining project in Timrali, Hathras, Uttar Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Ravi Kumar Goswami.
Has it been approved?
No. The application was lapsed on 1 Sept 2025, so it is no longer under consideration.
Where is it?
In Timrali, Hathras, Uttar Pradesh.
How big is it?
It has a stated cost of ₹14 lakh and a site of 0.7 acres.
When was it filed?
The application was filed on 16 May 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Sept 2025 |
| Application filed | 16 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ravi Kumar Goswami |
| Land area | 2,800 m² |
| Project cost | ₹14 lakh |
| Village / locality | Timrali |
| Taluk / tehsil | Hathras |
| District | Hathras |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02707 |
In context
47 applications in Hathras since January 2022 are in the same category (Mining): 32 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.7 acres, this one is smaller than 98% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Timrali, Hathras, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Earth Mining" Project at Gata No.- 82, 85, Village- Udaibhan… — environmental approval granted, 200 m away
- "Ordinary Soil Mining" Project at Gata No.- 80मि०, 93, 94, 96, Village-… — environmental approval granted, 700 m away
- "Ordinary Soil Mining" Project at Gata No.- 98, Village- Udaibhan Bhakroi,… — environmental approval granted, 900 m away
- Diversion of P.F. land under social forestry division, Hathras for access road… — forest land use approved, 1.4 km away
- The Diversion of Road Side Protected Forest Land (0.0684 Hac.) on… — forest land use approved, 3.4 km away
- Diversion of 0.1124 Hectare of Protected Forest land under social forestry… — lapsed, 3.9 km away
- "Ordinary Soil Mining" Project at Gata No.- 72, Village- Rayak, Tehsil-… — environmental approval granted, 4.1 km away
- 44 Court rooms for Integrated Court Complex — cleared for impact study, 6.2 km away
More from Ravi Kumar Goswami in Hathras
- "Ordinary Soil Mining" Project at Gata No.- 98, Village- Udaibhan Bhakroi,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.