Quick answers
What is Sand/Morrum Mining on Ken Riverbed in Gata No. 60?
Sand/Morrum Mining on Ken Riverbed in Gata No. 60 is a lapsed mining project in Sandi, Banda, Uttar Pradesh. The site covers 44.5 acres.
Who is building it?
The applicant is Anita Sharma.
Has it been approved?
No. The application was lapsed on 11 May 2025, so it is no longer under consideration.
Where is it?
In Sandi, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 44.5 acres.
When was it filed?
The application was filed on 16 Nov 2024.
Project details
| Official title | Sand/Morrum Mining on Ken Riverbed in Gata No. 60 at Village- Sadikhadar, Tehsil- Pailani, District- Banda, Uttar Pradesh |
|---|---|
| Status | Lapsed |
| Status since | 11 May 2025 |
| Application filed | 16 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Anita Sharma |
| Land area | 44.5 acres (18 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Sandi |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01619 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 44.5 acres, this one is larger than 61% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 89 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Sandi, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — environmental approval granted, 50 m away
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — cleared for impact study, 50 m away
- Sandi Khadar Sand/Morrum Mine — environmental approval granted, 1 km away
- Sandi Khadar Sand/Morrum Mine — cleared for impact study, 1 km away
- Sand/Morrum Mining at Ken River Bed, Gata no.-04, Village- Sandikhadar, Tehsil… — environmental approval granted, 1.2 km away
- Sand/Morrum Mining at Ken River Bed, Gata no.-04, Village- Sandikhadar, Tehsil… — cleared for impact study, 1.2 km away
- Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River… — under environmental review, 1.2 km away
- Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River… — under environmental review, 1.2 km away
More from Anita Sharma in Banda
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — environmental approval granted
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.