Quick answers
What is Sandi Khadar Sand/Morrum Mine?
Sandi Khadar Sand/Morrum Mine is an approved mining project in Sandi, Banda, Uttar Pradesh. The site covers 66.7 acres.
Who is building it?
The applicant is New Eureka Mines and Minerals Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Oct 2024), as of 27 Nov 2026.
Where is it?
In Sandi, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3 lakh and a site of 66.7 acres.
When was it filed?
The application was filed on 27 Apr 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Oct 2024 |
| Application filed | 27 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | New Eureka Mines and Minerals Private Limited |
| Land area | 66.7 acres (27 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Sandi |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01985 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Apr 2024 (this page) | Environmental approval granted | 66.7 acres | ₹3 lakh |
| Early planning filed 10 Aug 2023 | Cleared for impact study | 66.7 acres | ₹3 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 66.7 acres, this one is larger than 91% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Sandi, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sandi Khadar Sand/Morrum Mine — cleared for impact study, 0 m away
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — environmental approval granted, 1000 m away
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — cleared for impact study, 1000 m away
- Sand/Morrum Mining on Ken Riverbed in Gata No. 60 — lapsed, 1 km away
- "River Bed Sand/ Morrum Mining from Ken River bed " — environmental approval granted, 2 km away
- "River Bed Sand/ Morrum Mining from Ken River bed " — cleared for impact study, 2 km away
- Sand/Morrum Mining at Ken River Bed, Gata no.-04, Village- Sandikhadar, Tehsil… — environmental approval granted, 2.1 km away
- Sand/Morrum Mining at Ken River Bed, Gata no.-04, Village- Sandikhadar, Tehsil… — cleared for impact study, 2.1 km away
All 7 New Eureka Mines projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.