Quick answers
What is this project?
Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River (13.00 ha) is a proposed mining project in Kharei, Banda, Uttar Pradesh. The site covers 32.1 acres.
Who is building it?
The applicant is Arun Kumar Mishra.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kharei, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.2 crore and a site of 32.1 acres.
When was it filed?
The application was filed on 22 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River (13.00 ha)
Project details
| Status | Under environmental review |
|---|---|
| Status since | 13 Oct 2026 |
| Application filed | 22 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Arun Kumar Mishra |
| Land area | 32.1 acres (13 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Kharei |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03662 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Oct 2026 | Under environmental review | 32.1 acres | ₹3.2 crore |
| Early planning filed 22 Sept 2025 (this page) | Under environmental review | 32.1 acres | ₹3.2 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 32.1 acres, this one is smaller than 53% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 64.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Kharei, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River… — under environmental review, 0 m away
- Sand/Morrum Mining at Ken River Bed, Gata no.-04, Village- Sandikhadar, Tehsil… — environmental approval granted, 50 m away
- Sand/Morrum Mining at Ken River Bed, Gata no.-04, Village- Sandikhadar, Tehsil… — cleared for impact study, 50 m away
- "Sand / Morrum Mining" from Riverbed of Ken River Village- Khairai, Gata No.-… — environmental approval granted, 850 m away
- "Sand / Morrum Mining" from Riverbed of Ken River Village- Khairai, Gata No.-… — cleared for impact study, 850 m away
- Sand/Morrum Mining on Ken Riverbed in Gata No. 60 — lapsed, 1.2 km away
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — environmental approval granted, 1.3 km away
- Sand/Morrum Mine from Riverbed of Ken River, Village- Sadikhadar, Gata No.-… — cleared for impact study, 1.3 km away
More from Arun Kumar Mishra in Banda
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — under environmental review
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.