Quick answers
What is Sand/Morrum Mining" on the riverbed of Betwa River?
Sand/Morrum Mining" on the riverbed of Betwa River is an approved mining project in Kurauna, Orai, Jalaun, Uttar Pradesh. The site covers 50 acres.
Who is building it?
The applicant is Saksham Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Oct 2024), as of 27 Nov 2026.
Where is it?
In Kurauna, Orai, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2 crore and a site of 50 acres.
When was it filed?
The application was filed on 20 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Oct 2024 |
| Application filed | 20 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Saksham Gupta |
| Land area | 50 acres (20.2 ha) |
| Project cost | ₹2 crore |
| Village / locality | Kurauna |
| Taluk / tehsil | Orai |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01647 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Aug 2024 (this page) | Environmental approval granted | 50 acres | ₹2 crore |
| Early planning filed 12 May 2023 | Cleared for impact study | 50 acres | ₹2 crore |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 200.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Kurauna, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining" on the riverbed of Betwa River — cleared for impact study, 0 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — more information requested, 200 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 200 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — more information requested, 350 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 350 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 350 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — under environmental review, 750 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.