What is Developing? Open the mapMap

Environmental approval grantedMining · Jalaun, Uttar Pradesh

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No.317 Mi, Khand No. 03, Area 20.242 ha

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No.317 Mi, Khand No. 03, Area 20.242 ha is an approved mining project in Kurauna, Orai, Jalaun, Uttar Pradesh. The site covers 50 acres. Its stated project cost is ₹6.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Jun 2025).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No.317 Mi, Khand No. 03, Area 20.242 ha is an approved mining project in Kurauna, Orai, Jalaun, Uttar Pradesh. The site covers 50 acres.

Who is building it?

The applicant is Ravi Kumar Tak.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 3 Jun 2025), as of 27 Nov 2026.

Where is it?

In Kurauna, Orai, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹6.8 crore and a site of 50 acres.

When was it filed?

The application was filed on 29 Apr 2025.

Project details

Official titleProposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No.317 Mi, Khand No. 03, Area 20.242 ha in Village- Kurauna, Tehsil- Orai, District- Jalaun, Uttar Pradesh of Coral Associates Partner Shri Ravi Kumar Tak
StatusEnvironmental approval granted
Status since3 Jun 2025
Application filed29 Apr 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRavi Kumar Tak
Land area50 acres (20.2 ha)
Project cost₹6.8 crore
Village / localityKurauna
Taluk / tehsilOrai
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03666

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Apr 2025 (this page)Environmental approval granted50 acres₹6.8 crore
Early planning filed 11 Sept 2024Cleared for impact study50 acres₹6.8 crore

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 140.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.

Where it is

Kurauna, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.